Dream Elements:
1.    FACILITATION CENTER
2.    DAY CARE CENTER
3.    TUITION CENTER
4.    MANAGEMENT COMMITTEE
5.    MAINTENANCE WORKSHOP
6.    CONTROLLING BY LAW
7.    POST DELIVERY SYSTEM
8.    FOUNDER MEMBERS
9.    C.C T.V
10.  FIRE HYDRANTS
11.  GARBAGE DISPOSAL SYSTEM
The project is launched on Feb 20, 2011 and 40% of the project is sold (as on Feb 26, 2011). More than 80% construction is Complete. See the Revised Price List updated on 27-3-11
Advantages:
1.    Dual Approach from D.H.A "W" Block and
       Walton Stop at Walton Road.
2.    High Profile Advantages at Low Price.
3.    At the Door Step of DHA Phase III.
4.    24 Hours Public Transport Availability.
5.    Available at Down Payment and
       Installments.
6.    Flexible Payment Plans.
7.    Special Discounts on Down Payment.
8.    Bank Loan Facility Available.

Features:
1.    Peaceful Living with Security
       and Privacy.
2.    Gated, Bounded and Guarded
       Community.
3.    100% Developed, Meeting with
       Up to the Mark Standards.
4.    Ready to Live in.
5.    Free of Cost Maintenance of
       Services for Six Months.
6.    Construction Work in Progress.

Facilities:
1.    Controlled Single Entry with Elegant Gate.
2.    Bounded Community.
3.    Paved Roads.
4.    Underground Services
  • Residential, Single Phase Electric Meter.
  • Residential Gas Meter.
  • Water Supply (Dual Connection).
  • Sewerage System.
  • T.V. Telephone/Internet Cable.
www.dreamhomes-pk.com All rights reserved.

Powered by web analytics software.